Roadwork underway on Las Vegas Strip for 2025 F1 Grand Prix

- Advertisement -

LAS VEGAS (KLAS) — Drivers could discover in a single day closures alongside the Las Vegas Strip as roadwork will get underway in preparation for the Components 1 Las Vegas Grand Prix.

The roadwork alongside the Las Vegas Strip Circuit began on Sept. 1 with in a single day closures on Koval Lane within the space adjoining to Rochelle Avenue.

In the course of the week of Sept. 8 via Sept. 14, in a single day lane reductions will happen on Harmon Avenue between Las Vegas Boulevard and Koval Lane.

Roadwork from Sept. 8-12

Lane reductions in a single day from 9:00 p.m. to six:00 a.m. on Harmon Avenue between Las Vegas Boulevard and Koval Lane. One lane will stay open in every course in a single day.

Roadwork from Sept. 14-19

Lane reductions in a single day from 9 p.m. to six a.m. on Harmon Avenue between Las Vegas Boulevard and Koval Lane. One lane will stay open in every course in a single day.

The 50-lap race takes place on a 3.8-mile circuit and sees drivers attain speeds of over 215 mph (346 kph).

The 2025 race will happen on November 20-22.

- Advertisement -

LEAVE A REPLY

Please enter your comment!
Please enter your name here


More like this
Related

Las Vegas Raiders vs. Los Angeles Chargers: TV channel, time, what to know

LAS VEGAS (KLAS) -- The Las Vegas Raiders are...

Las Vegas neighborhood remembers 9/11 terrorist assault

LAS VEGAS (KLAS) -- Firefighters, police, and neighborhood members...

Boring Firm employee injured throughout tunnel work close to Las Vegas Strip

LAS VEGAS (KLAS) -- An worker with The Boring...

These 10 employers are the very best to work for in Nevada, Forbes report reveals

LAS VEGAS (KLAS) -- Do you're employed for the...