LAS VEGAS (KLAS) — The set up of utilities for the Brightline West high-speed rail venture will trigger in a single day closures and restrictions on the I-15 Sloan Highway interchange beginning subsequent week.
Beginning Tuesday, Sept. 2, from 8 p.m. to six a.m., the northbound I-15 on and off ramps at Sloan Highway might be closed and drivers might be directed to St. Rose Parkway to entry the I-15 or Las Vegas Boulevard.
NDOT expects Las Vegas-to-LA high-speed prepare building to start inside 2 months
Sloan Highway might be closed to westbound visitors at Las Vegas Boulevard on Wednesday, Sept. 3, from 8 p.m. to six a.m. Eastbound visitors might be flagged by way of the work zone as properly. Drives on Las Vegas Boulevard, driving west on Sloan Highway should use St. Rose Parkway to entry I-15 and reconnect to Sloan.
Excessive-speed prepare venture seeks time extensions on permits for Las Vegas station
The closures might be in place to permit crews to securely set up utilities for the high-speed rail venture. There might be digital message boards in place to alert motorists of the adjustments.
The dates and occasions of the closures and restrictions are topic to alter and the operations are weather-dependent.